spine with masts along the length of the building allowing for a
post-free area and so providing a flexible interior and the possibility of
Kaynak: Inmos microprocessor factoryThis is a triple span
post-free trellis frame steel bridge supported by a continuous beam. The bridge was opened on 12 August 1956.
Kaynak: Rhine Bridge, Kehl